{"id":313,"date":"2019-04-09T12:08:24","date_gmt":"2019-04-09T17:08:24","guid":{"rendered":"http:\/\/eeppaa.tech\/?page_id=313"},"modified":"2019-04-20T17:31:53","modified_gmt":"2019-04-20T22:31:53","slug":"aparatos","status":"publish","type":"page","link":"https:\/\/eeppaa.tech\/aparatos\/","title":{"rendered":"ESPA\u00d1OL APARATOS"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">APPARATUSES\nAPARATOS <\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>\u2022\n     <strong>Quick Details<\/strong>\n     \u2022 <strong>Detalles\n     r\u00e1pidos<\/strong>\n     <\/li><li>\u2022Model\n     Number: 1.5MW, 2MW, 3MW, 6MW, 7.5MW, 12MW , 50MW 100MW\n     \u2022 N\u00famero de modelo: 1.5MW, 2MW, 3MW, 6MW, 7.5MW, 12MW, 50MW 100MW <\/li><li>\u2022Certification:\n     ASME, CE, PED \u2022 Certificaci\u00f3n: ASME, CE, PED <\/li><li>\u2022\n     <strong>Packaging &amp; Delivery<\/strong>\n     \u2022 <strong>Embalaje\n     y entrega<\/strong>\n     <\/li><li>\u2022Delivery\n     Time 180 days &amp;#8211; \u2022 Tiempo de entrega 180\n     d\u00edas &amp; # 8211;\n     250 days <strong>Specifications<\/strong> 250 d\u00edas <strong>Especificaciones<\/strong> <\/li><li>\u2022Providing\n     10T\/h \u2013 220T\/h different types of boilers according to clients&#8217;\n     requirements and specifications, industrial boilers and boilers for power\n     plants. \u2022 Proporcionar diferentes tipos de calderas de 10T \/ h\n     &#8211; 220T \/ h de acuerdo con los requisitos y especificaciones de los\n     clientes, calderas industriales y calderas para centrales el\u00e9ctricas. The type of boilers can be grate boilers, FCB\n     boilers, pulverized coal fired boilers. El\n     tipo de calderas puede ser calderas de parrilla, calderas FCB, calderas de\n     carb\u00f3n pulverizado. <\/li><li>\u2022Based\n     on the professional team and strong support from our boiler manufacturers\n     &amp; partners, we can provide industrial power plants with the capacity\n     of they Desire, which fired manifold fuel such as coal, oil, gas, biomass\n     fuel, etc. At same time, we will provide professional service with an\n     integrate solution to clients for project planning, engineering, design\n     &amp; management, equipment fabrication &amp; procurement, supervision for\n     construction, installation, commissioning and test run, and training and\n     after sales service. \u2022 Bas\u00e1ndonos en el\n     equipo profesional y el s\u00f3lido apoyo de nuestros fabricantes y socios de\n     calderas, podemos proporcionar a las plantas de energ\u00eda industrial la\n     capacidad de Desire, que gener\u00f3 m\u00faltiples combustibles como carb\u00f3n,\n     petr\u00f3leo, gas, combustible de biomasa, etc. Al mismo tiempo, Brindaremos\n     un servicio profesional con una soluci\u00f3n integrada para los clientes para\n     la planificaci\u00f3n de proyectos, ingenier\u00eda, dise\u00f1o y gesti\u00f3n, fabricaci\u00f3n y\n     adquisici\u00f3n de equipos, supervisi\u00f3n para la construcci\u00f3n, instalaci\u00f3n,\n     puesta en marcha y prueba de ejecuci\u00f3n, y capacitaci\u00f3n y servicio\n     postventa.\n     The power plant will be accorded with\n     following key properties: -Customized engineering design according to\n     prevailing standard, main equipment will be in accordance with ASME code,\n     control system and electrical system will be in accordance with IEC\n     standard; La planta de energ\u00eda se acordar\u00e1\n     con las siguientes propiedades clave: -Dise\u00f1o personalizado de ingenier\u00eda\n     de acuerdo con la norma vigente, el equipo principal estar\u00e1 de acuerdo con\n     el c\u00f3digo ASME, el sistema de control y el sistema el\u00e9ctrico estar\u00e1n de\n     acuerdo con la norma IEC; -Customized\n     boiler with ASME stamp, or without ASME stamp; &#8211; Caldera personalizada con sello ASME, o sin sello\n     ASME; -Customized boiler according to\n     clients&#8217; requirement, it can be grate stoker boiler, CFB boiler, or\n     pulverized coal fired boiler to adapt different fuel; &#8211; Caldera personalizada seg\u00fan el requisito de los\n     clientes, puede ser caldera de parrilla, caldera CFB o caldera de carb\u00f3n\n     pulverizado para adaptar diferentes combustibles; -The steam turbine can be condensing unit,\n     extraction steam unit, or back pressure extraction unit to meet the needs\n     of different clients; -La turbina de vapor\n     puede ser una unidad de condensaci\u00f3n, una unidad de extracci\u00f3n de vapor o\n     una unidad de extracci\u00f3n de contrapresi\u00f3n para satisfacer las necesidades\n     de diferentes clientes; -The generator\n     can be 50Hz or 60Hz with different voltage to adapt the situation in\n     different area and countries; -El generador\n     puede ser de 50Hz o 60Hz con diferentes voltajes para adaptar la situaci\u00f3n\n     en diferentes \u00e1reas y pa\u00edses; -The\n     control system can be used by instrument control, PLC control, or DCS\n     control against on the clients&#8217; requirement of investment cost control; -El sistema de control puede ser utilizado por control\n     de instrumentos, control de PLC o control de DCS en contra de los\n     requisitos de control de costos de inversi\u00f3n de los clientes; -Supervision for installation at construction site\n     to save clients&#8217; erection cost;\n     -Supervisi\u00f3n para la instalaci\u00f3n en el sitio de construcci\u00f3n para ahorrar\n     costos de montaje de los clientes; -Flexible\n     training manner for operators, it can be chosen by the client, training at\n     construction site; -Forma de entrenamiento\n     flexible para los operadores, puede ser elegida por el cliente,\n     entrenamiento en el sitio de construcci\u00f3n; -Spare parts supply in time; &#8211; Suministro de repuestos a tiempo. -Exported package in accordance with the\n     requirement of sea transportation; &#8211;\n     Paquete exportado de acuerdo con el requisito de transporte mar\u00edtimo;\n     -Providing the service of third part\n     inspection to the exported equipment;\n     -Proporcionar el servicio de inspecci\u00f3n de la tercera parte al equipo\n     exportado; -Providing the service for\n     assessment of CE mark if necessary.\n     -Proporcionar el servicio para la evaluaci\u00f3n de la marca CE si es\n     necesario. Our predominance consists\n     in following key points: -Rich experience to the projects management and\n     projects exporting for the power plant;\n     Nuestro predominio consiste en los siguientes puntos clave: -Experiencia\n     rica en la gesti\u00f3n de proyectos y proyectos de exportaci\u00f3n para la planta\n     de energ\u00eda; -Better capability to\n     communicate with clients in technology and language; -Mejor capacidad para comunicarse con los clientes en\n     tecnolog\u00eda y lenguaje; -Many\n     successful cooperation achievement in supplying complete set of equipment\n     and spare parts for coal fired power plant, biomass fuel fired power\n     station, and gas-turbine combined cycle generating unit in Indonesia,\n     Malaysia, Iraq, Pakistan, Bangladesh, and Mongolia. -Muchos logros de cooperaci\u00f3n exitosos en el suministro\n     de un conjunto completo de equipos y piezas de repuesto para la central\n     el\u00e9ctrica de carb\u00f3n, la central el\u00e9ctrica de combustible de biomasa y la\n     unidad de generaci\u00f3n de ciclo combinado de turbina de gas en Indonesia,\n     Malasia, Irak, Pakist\u00e1n, Bangladesh y Mongolia. -Rich experience to cooperate with foreign\n     engineering company such as Austrian Energy &amp; Environment AG, etc.\n     -Professional team cooperation and flexible cooperation manner, general\n     contracting for a project, or sub-contracting for a part of project. -Experiencia rica para cooperar con una empresa de\n     ingenier\u00eda extranjera como Austrian Energy &amp; Environment AG, etc. -Cooperaci\u00f3n\n     de equipo profesional y cooperaci\u00f3n flexible, contrataci\u00f3n general para un\n     proyecto o subcontrataci\u00f3n de una parte del proyecto. <\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>APPARATUSES APARATOS \u2022 Quick Details \u2022 Detalles r\u00e1pidos \u2022Model Number: 1.5MW, 2MW, 3MW, 6MW, 7.5MW, 12MW , 50MW 100MW \u2022 N\u00famero de modelo: 1.5MW, 2MW, 3MW, 6MW, 7.5MW, 12MW, 50MW 100MW \u2022Certification: ASME, CE, PED \u2022 Certificaci\u00f3n: ASME, CE, PED \u2022 Packaging &amp; Delivery \u2022 Embalaje y entrega \u2022Delivery Time 180 days &amp;#8211; \u2022 Tiempo [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-313","page","type-page","status-publish","hentry"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/eeppaa.tech\/wp-json\/wp\/v2\/pages\/313","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eeppaa.tech\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/eeppaa.tech\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/eeppaa.tech\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/eeppaa.tech\/wp-json\/wp\/v2\/comments?post=313"}],"version-history":[{"count":2,"href":"https:\/\/eeppaa.tech\/wp-json\/wp\/v2\/pages\/313\/revisions"}],"predecessor-version":[{"id":591,"href":"https:\/\/eeppaa.tech\/wp-json\/wp\/v2\/pages\/313\/revisions\/591"}],"wp:attachment":[{"href":"https:\/\/eeppaa.tech\/wp-json\/wp\/v2\/media?parent=313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}