{"id":81,"date":"2019-03-26T14:13:55","date_gmt":"2019-03-26T19:13:55","guid":{"rendered":"http:\/\/eeppaa.tech\/?page_id=81"},"modified":"2019-05-31T14:44:28","modified_gmt":"2019-05-31T19:44:28","slug":"apparatuses","status":"publish","type":"page","link":"https:\/\/eeppaa.tech\/?page_id=81","title":{"rendered":"APPARATUSES"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">APPARATUSES<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"271\" height=\"186\" src=\"http:\/\/eeppaa.tech\/wp-content\/uploads\/2019\/04\/descarga.jpg\" alt=\"\" class=\"wp-image-354\" srcset=\"https:\/\/eeppaa.tech\/wp-content\/uploads\/2019\/04\/descarga.jpg 271w, https:\/\/eeppaa.tech\/wp-content\/uploads\/2019\/04\/descarga-270x186.jpg 270w\" sizes=\"auto, (max-width: 271px) 100vw, 271px\" \/><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>\u2022<strong>Quick Details<\/strong><\/li><li>\u2022Model Number: 1.5MW, 2MW, 3MW, 6MW, 7.5MW, 12MW ,\n50MW 100MW<\/li><li>\u2022Certification: ASME, CE, PED <\/li><li>\u2022<strong>Packaging &amp; Delivery<\/strong><\/li><li>\u2022Delivery Time 180 days &amp;#8211; 250 days <strong>Specifications<\/strong><\/li><li>\u2022Providing 10T\/h &#8211; 220T\/h different types of boilers\naccording to clients&#8217; requirements and specifications, industrial boilers and\nboilers for power plants. The type of boilers can be grate boilers, FCB\nboilers, pulverized coal fired boilers. <\/li><li>\u2022Based on the professional team and strong support\nfrom our boiler manufacturers &amp; partners, we can provide industrial power\nplants with the capacity of they Desire, which fired manifold fuel such as\ncoal, oil, gas, biomass fuel, etc. At same time, we will provide professional\nservice with an integrate solution to clients for project planning,\nengineering, design &amp; management, equipment fabrication &amp; procurement,\nsupervision for construction, installation, commissioning and test run, and\ntraining and after sales service. The power plant will be accorded with\nfollowing key properties: -Customized engineering design according to\nprevailing standard, main equipment will be in accordance with ASME code,\ncontrol system and electrical system will be in accordance with IEC standard;\n-Customized boiler with ASME stamp, or without ASME stamp; -Customized boiler\naccording to clients&#8217; requirement, it can be grate stoker boiler, CFB boiler,\nor pulverized coal fired boiler to adapt different fuel; -The steam turbine can\nbe condensing unit, extraction steam unit, or back pressure extraction unit to\nmeet the needs of different clients; -The generator can be 50Hz or 60Hz with\ndifferent voltage to adapt the situation in different area and countries; -The\ncontrol system can be used by instrument control, PLC control, or DCS control\nagainst on the clients&#8217; requirement of investment cost control; -Supervision\nfor installation at construction site to save clients&#8217; erection cost; -Flexible\ntraining manner for operators, it can be chosen by the client, training at\nconstruction site; -Spare parts supply in time; -Exported package in accordance\nwith the requirement of sea transportation; -Providing the service of third\npart inspection to the exported equipment; -Providing the service for\nassessment of CE mark if necessary. Our predominance consists in following key\npoints: -Rich experience to the projects management and projects exporting for\nthe power plant; -Better capability to communicate with clients in technology\nand language; -Many successful cooperation achievement in supplying complete\nset of equipment and spare parts for coal fired power plant, biomass fuel fired\npower station, and gas-turbine combined cycle generating unit in Indonesia,\nMalaysia, Iraq, Pakistan, Bangladesh, and Mongolia. -Rich experience to\ncooperate with foreign engineering company such as Austrian Energy &amp;\nEnvironment AG, etc. -Professional team cooperation and flexible cooperation\nmanner, general contracting for a project, or sub-contracting for a part of\nproject.<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"634\" height=\"375\" src=\"http:\/\/eeppaa.tech\/wp-content\/uploads\/2019\/04\/2963084F00000578-0-image-a-1_1461092151159.jpg\" alt=\"\" class=\"wp-image-352\" srcset=\"https:\/\/eeppaa.tech\/wp-content\/uploads\/2019\/04\/2963084F00000578-0-image-a-1_1461092151159.jpg 634w, https:\/\/eeppaa.tech\/wp-content\/uploads\/2019\/04\/2963084F00000578-0-image-a-1_1461092151159-300x177.jpg 300w, https:\/\/eeppaa.tech\/wp-content\/uploads\/2019\/04\/2963084F00000578-0-image-a-1_1461092151159-390x231.jpg 390w\" sizes=\"auto, (max-width: 634px) 100vw, 634px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>APPARATUSES \u2022Quick Details \u2022Model Number: 1.5MW, 2MW, 3MW, 6MW, 7.5MW, 12MW , 50MW 100MW \u2022Certification: ASME, CE, PED \u2022Packaging &amp; Delivery \u2022Delivery Time 180 days &amp;#8211; 250 days Specifications \u2022Providing [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_EventAllDay":false,"_EventTimezone":"","_EventStartDate":"","_EventEndDate":"","_EventStartDateUTC":"","_EventEndDateUTC":"","_EventShowMap":false,"_EventShowMapLink":false,"_EventURL":"","_EventCost":"","_EventCostDescription":"","_EventCurrencySymbol":"","_EventCurrencyCode":"","_EventCurrencyPosition":"","_EventDateTimeSeparator":"","_EventTimeRangeSeparator":"","_EventOrganizerID":[],"_EventVenueID":[],"_OrganizerEmail":"","_OrganizerPhone":"","_OrganizerWebsite":"","_VenueAddress":"","_VenueCity":"","_VenueCountry":"","_VenueProvince":"","_VenueState":"","_VenueZip":"","_VenuePhone":"","_VenueURL":"","_VenueStateProvince":"","_VenueLat":"","_VenueLng":"","_VenueShowMap":false,"_VenueShowMapLink":false,"footnotes":""},"class_list":["post-81","page","type-page","status-publish","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/eeppaa.tech\/index.php?rest_route=\/wp\/v2\/pages\/81","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eeppaa.tech\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/eeppaa.tech\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/eeppaa.tech\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/eeppaa.tech\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=81"}],"version-history":[{"count":2,"href":"https:\/\/eeppaa.tech\/index.php?rest_route=\/wp\/v2\/pages\/81\/revisions"}],"predecessor-version":[{"id":833,"href":"https:\/\/eeppaa.tech\/index.php?rest_route=\/wp\/v2\/pages\/81\/revisions\/833"}],"wp:attachment":[{"href":"https:\/\/eeppaa.tech\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=81"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}